Our projects

Processing department of metalwork CJSC EnergoProekt-Stalkonstrukciya located near St. Petersburg, at the address: 1N, Pavilion Urickogo st., Pushkin.
2010–2011 — Project construction ”Baltic Pipeline System-2 (BPS-2). Petroleum storage depot Ust-Luga”, OJSC “Transneft”.

Ust-Luga”. OJSC “Transneft”
The following works were completed:

  • Development of technical documentation
  • Manufacturing of metalwork
  • Delivery of finished products  to construction site
  • Erection of steel bearing and cladding structures
  • Erection of processing equipment 

2006–2010 — Project construction “Transfer station (TS) ¹10, Commercial Sea Port of Ust-Luga. Coal terminal. Cable bridge from TS ¹9 to TS ¹10”. OJSC “Rosterminalugol”.

During construction of:

  • Transfer stations
  • Bridges
  • Passageways
  • Cable bridges
  • Processing lines of 1st, 2nd, 3rd starting construction stages OJSC “Rosterminalugol”

the following works were completed:

  • Development of technical documentation
  • Manufacturing of metalwork
  • Delivery of finished products to construction site
  • Erection of steelwork and processing equipment
  • Antirust processing
  • Fireproofing.
2008–2009 — Project construction “Commercial Sea Port of Ust-Luga”, sulphur transferring terminal.

Construction period  2008–2009

The following works were completed:

  • Development of technical documentation
  • Manufacturing of metalwork
  • Delivery of finished products  to construction site
  • Fireproofing of metalwork
  • Erection of processing equipment  and technology containers
2010–2012 — General contract on construction of railroad overpass for offshoot of light oil ¹3.

As a general contractor our company completed  the following works during the construction period:

  • Development of technical documentation
  • Manufacturing of metalwork
  • Delivery of finished products  to construction site
  • Early works
  • Earthwork operations
  • Assembling of railway lines
  • Erection of concrete component
  • Erection of cladding structures
  • Erection of processing equipment  
  • Construction of fire-fighting engineering system
  • Erection of industrial pipelines
  • Fireproofing of metalwork
  • Infrastructure development of engineering systems
  • Starting-up and adjustment of engineering systems  and processing equipment.

Client: OJSC "Rosneftbunker"

2009–2010 — “Independent stack-frame of shuttle conveyer for pulverized feed of limestone fines to storage warehouse” OJSC “Pikalevskiy cement”.

During construction period (September, 2009 – August, 2010) the following works were completed:

  • Development of technical documentation  for buildings and constructions of OJSC “Pikalevskiy cement”
  • Manufacturing of metalwork
  • Delivery of finished products  to construction site
  • Steel frame assembling.
2010 — Project construction “Auto plant LLC “Hyundai Motor Manufacturing Rus”.

Hyundai Motor Company is the largest Korean carmaker. September, 2010 own industrial plant goes on stream. Our company was fully engaged in construction of plant and completed  the following works during the construction period:

  • Development of technical documentation 
  • Manufacturing of metalwork
  • Delivery of finished products  to construction site
  • Erection of steel bearing and cladding structures.
2007–2008 — Project construction “Cross functional logistical A-category terminal LLC ”MLP-KAD”, Novosaratovka-Centre village, Vsevolozhskiy district, Leningradskiy region (Utkina Zavod’).
The object is a large-size logistical A-category terminal  in North-West Russia. Building area — 209 255 sqm.
2012 — Construction of complex for transshipping of liquified petroleum gas, piping rack. OJSC “Novatek”.

Our company  took the part in construction of the CIS largest complex for transshipping of liquified petroleum gas. The following works were completed:

  • Development of technical documentation on Detailed Design
  • Manufacturing of metalwork
  • Delivery of finished products  to construction site
  • Fireproofing of metalwork.
2012–2013 — Construction and assembly works during the phase 2 construction of rebuilding and restoration operations of General Staff Building of the State Hermitage Museum.

The following works were completed:

  • Development of technical documentation on Architectural Solutions/ Metalwork/ Detailed Design
  • Delivery and erection of structural steel
  • Assembly of rolled roofing material
  • Fireproofing of metalwork.
2011 — Construction of shopping mall “Shuvalovski”.

During construction period (May, 2011 – August, 2011) the following works were completed:

  • Development of technical documentation
  • Pile substructure design
  • Land cofferdam design
  • Manufacturing and delivery of tongued-and-grooved anchor piles and shell-type piles
  • Construction and erection works.
2012 — Project construction “Training ice arena for figure skating”, Sochi, Imeretinskaya plain, Krasnodarskiy district, Adlerskiy region.

The following works were completed:

  • Development of technical documentation on Detailed Design
  • Manufacturing of metalwork
  • Delivery of finished products  to construction site
  • Antirust processing of metalwork
  • Fireproofing of metalwork.
2012 — Construction of Woodworking complex “Kalevala”, Petrozavodsk, Republic of Karelia.

The following works were completed:

  • Development of technical documentation on Detailed Design
  • Manufacturing of metalwork
  • Delivery and erection of of steel bearing and cladding structures
  • Assembly of processing equipment 
  • Fireproofing of metalwork.

Client: CJSC “Kompakt”.

2013 — Delivery of metalwork for project “Rebuilding operations of regional thermal grid, Engels av. (from heating chamber-5 on 5th Verhiy lane to boiler-house “Parnas”) ”

Our company took the part in rebuilding operations of one of the major investment program projects.

The following works were completed:

  • Development of technical documentation       
  • Manufacturing of metalwork.
2012 — Construction of buildings of “Congress and exhibition centre Expoforum”, St. Petersburg.

 Our company took the part in construction of modern congress and exhibition centre Expoforum in St. Petersburg — newest and most modern venue for business, cultural, and entertainment events of any type and almost any size.
The following works were completed:

  • Development of technical documentation
  • Manufacturing of metalwork
  • Delivery of finished products  to construction site
  • Erection of steel bearing and cladding structures
  • Antirust processing of metalwork    
  • Fireproofing of metalwork           
  • Infrastructure development of automatic fire-fighting system.
2012–2013 — Disassembling of processing equipment on manufacturing of synthetic detergents, Tosno, Leningradskiy region. Client: SLL “HenkelRus”.
2013 — Project construction “Cat cracking complex” OJSC “Syzran Refinery”.

During realization of large project of OJSC “Syzran Refinery”,which is located in Samara region and is part of Samara refinery group, the following works were completed:

  • Development of technical documentation
  • Manufacturing of metalwork
  • Delivery of finished products  to construction site
  • Erection of metalwork on construction site
  • Erection of industrial pipelines.
2013 — Project construction “Processing department of reinforced concrete products, Pskov ”.

Client: OJSC "ZhBI-Pskov"
As a general contractor our company completed  the following works during the construction period:

  • Development of technical documentation on Metalwork/ RC construction/ Architectural Solutions/
  • Early works
  • Earthwork operations
  • Infrastructure development of foundation
  • Manufacturing of metalwork
  • Delivery of finished products  to construction site
  • Erection of steel bearing and cladding structures
  • Antirust processing of metalwork.
n

News

n
n
10.08.2012
n n
n Happy builder's day!
Dear colleagues!
Congratulations on upcoming professional holiday — the Day of the Builder!
We wish you more rich colors of life, strong family foundation and new constructive heights!n