Our projects

2012–2013 — Construction and assembly works during the phase 2 construction of rebuilding and restoration operations of General Staff Building of the State Hermitage Museum.

The following works were completed:

  • Development of technical documentation on Architectural Solutions/ Metalwork/ Detailed Design
  • Delivery and erection of structural steel
  • Assembly of rolled roofing material
  • Fireproofing of metalwork.