Our projects

2010–2011 — Project construction ”Baltic Pipeline System-2 (BPS-2). Petroleum storage depot Ust-Luga”, OJSC “Transneft”.

Ust-Luga”. OJSC “Transneft”
The following works were completed:

  • Development of technical documentation
  • Manufacturing of metalwork
  • Delivery of finished products  to construction site
  • Erection of steel bearing and cladding structures
  • Erection of processing equipment 